So Anyway...

Just got from the dermatologist. Had to have 2 spots cut off the top off my head, 1 not so big, the other big enough to lay my thumb in.
The Dr managed to stitch it closed. Gave me a partial facelift they had to pull it so tight to close it up.
Daaaaaang! I don't know whether to laugh at this, or be worried... :confused2:

Telecasters creep me out too!!!!
Daaaaaang! I don't know whether to laugh at this, or be worried... :confused2:
 
Speaking about weather its snowing here right now started a few hours ago, they say this is not normal for November and it certainly is not where I live. We don't see snow here until January. I told my Wife I believed we were going to have a hard winter this year, because the leaves on the trees up at our trailer were falling 5 weeks earlier than normal. They say there is arctic air coming down over the Great lakes. We are to get 6 inches today stopping tonight, then starting back up tomorrow giving us another 6 inches of snow WOW!! I know those weather guys say its coming from the arctic, but I know better, its coming down here from Minnesota . :blink:P:lol:
 

Attachments

Last edited:
So anyway, I will be listing my Agile AD-2300 for sale.
I love so much, really everything about this guitar except I just cant get comfortable with the way it postions on my body while standing.
It is a neck heavy guitar, but even with the neck dive negated by the wide strap, I feel it is fighting me.

Really a downer.
I will make a sale thread and link to my Reverb when I get it posted.
The PO went to black hardware and upgaded the pickups but they are unidentified.

EDIT: Will do better on pricing and actual shipping to TTR members, continental US only.

Link with original specs:

20190311_185604.jpg
 
Last edited:
I took a break from guitars and amps today, and decided to do some yard work. I hate yard work, but the bushes were getting out of control.
Then I got the bright idea to change the hard drive in my Mac Mini to a SSD HD. I have to give kudos to APPLE.
they really know how to pack 5lbs of :poo: into a 1 lb box. I think this was the hardest computer job I have ever done.

You have to remove the entire insides to access the hard drive.
The job is done and the speed increase is very noticeable.
 
I took a break from guitars and amps today, and decided to do some yard work. I hate yard work, but the bushes were getting out of control.
Then I got the bright idea to change the hard drive in my Mac Mini to a SSD HD. I have to give kudos to APPLE.
they really know how to pack 5lbs of :poo: into a 1 lb box. I think this was the hardest computer job I have ever done.

You have to remove the entire insides to access the hard drive.
The job is done and the speed increase is very noticeable.

I did that exact task last winter. Huge boot speed increase! was yours a model with a cd/dvd drive?
 
So anyway, I was listening to some country, and then some blues, and then some commentaries by the artists...and I wondered how many graduates listened to these same things and realized they wasted a lot of money to get "smart" when they could have just been paying attention to life for free.
 
Last edited:
Chaz Fred should never have a scowl ever. From the brief meeting with him and his lovely bride, the day Smitty and I joined up with them in Annapolis, I knew he had a keeper. That is enough to make any man a happy camper 24/7 365

Thank you Chili, yes she is a keeper indeed. The scowl I got from my father . . . long story not worth telling.
Mrs Chas says to stell you Thank you also
 
So, anyway my boiler and hot water project is complete and scheduled for final inspections!
Nothing got blown up and nobody died from CO poisoning.

I will be blocking time to finish up some things guitar / amp / pedal related and for the next amp build as well.

The pic shows mainly the hot water heater, which is phase 2, and the new boiler to the left.

20191129_172047.jpg
 
So, anyway my boiler and hot water project is complete and scheduled for final inspections!
Nothing got blown up and nobody died from CO poisoning.

I will be blocking time to finish up some things guitar / amp / pedal related and for the next amp build as well.

The pic shows mainly the hot water heater, which is phase 2, and the new boiler to the left.

View attachment 35086
Always great to have a project come out with no problems.
Cheers
 
Back
Top