The wife and I bought a second home in Lake Arrowhead CA in October of last year. We then decided this is going to be our retirement home (we retired in January.). It has 1400 sq ft of unfinished build up area under the main/ground floor. This thread will be the ongoing story of my building of a 250 sq ft studio in the build out area.
The first pic is what the area looked like when we bought the place. Pretty rough. So we started the floor construction this week and finished today! I ran three 3” ABS pipes under the floor to fish cables through from one side to the other. The pipes coming out of the floor are not yet cut to the correct height. The floor is insulated with R38.
The room will be powered with two 20 Amp circuits and one 15 Amp circuit. The 2 exterior 2x6 walls resting on the concrete foundation will have an air gapped 2x3 wall on the interior and then filled with R30 insulation. All the walls will have double sheeted 5/8” dry wall with acoustic caulk/glue in the joint and between layers.
More to follow…

The first pic is what the area looked like when we bought the place. Pretty rough. So we started the floor construction this week and finished today! I ran three 3” ABS pipes under the floor to fish cables through from one side to the other. The pipes coming out of the floor are not yet cut to the correct height. The floor is insulated with R38.
The room will be powered with two 20 Amp circuits and one 15 Amp circuit. The 2 exterior 2x6 walls resting on the concrete foundation will have an air gapped 2x3 wall on the interior and then filled with R30 insulation. All the walls will have double sheeted 5/8” dry wall with acoustic caulk/glue in the joint and between layers.
More to follow…